AGRICULTURE
A PRN code transmitted by GPS satellites. The code consists of about 2.35 3 1014 chips and is sent at a rate of 10.23 megabits per second. At this rate, it would take 266 days to transmit the complete code. Each satellite is assigned a unique one-week segment of the code that is reset at Saturday/Sunday midnight. The P-code is currently transmitted on both the L1 and L2 frequencies.